Modeling Studies on the Vistula River from the Kościelnicki bay to the Nidzica River
Development of a spatial concept with strategic environmental assessment for the tasks:
- Expansion of the Vistula River left embankment from the mouth of the Kościelnicki Creek to the mouth of the Nidzica river,
- Expansion of the Vistula River right embankment in the Wielicki district.
Provided services:
- Assessment of the technical condition of shafts and structures,
- Environmental Inventory,
- Spatial concept,
- Hydraulic models in MIKE 11 including 3 variants,
- Environmental impact Assesment, Obtaining the required opinions and arrangements
Project
Development of a spatial concept with strategic environmental assessment for the tasks: Expansion of the Vistula River left embankment from the mouth of the Kościelnicki Creek to the mouth of the Nidzica river, Expansion of the Vistula River right embankment in the Wielicki district.
Investor
Małopolska Board of Land Reclamation and Water Facilities in Krakow
Location
Vistula River
Time period
12.2014 – 12.2015