Thermal waste treatment plant in Olsztyn
HaskoningDHV Polska will design a thermal waste treatment plant in Olsztyn.
The plant will be the first and at the same time the most modern facility of this type in Warmia and Mazury. It will allow waste utilization and energy recovery. The installation will replace the currently used coal installations. The investment is being developed under the Public-Private Partnership (PPP).
For the owner and the operator of the installation, Dobra Energia dla Olsztyna, a consortium of Doosan Heavy Industries and Contruction from Korea and Doosan Lentjes based in Germany, will build a complete facility with a boiler, semi-dry flue gas cleaning installation and selective catalytic reduction (SCR).
HaskoningDHV Polska will execute a building permit design and a detailed design, which include facilities necessary for the implemantation of the installation of thermal conversion and of the energy fraction from municipal waste along with the recovery of electricity and heat with accompanying infrastructure.